Services Traffic Systems Innovation & Research UAV Surveys Contact
Planning Office · HX mobility GmbH

Temporary traffic management.
Thoughtfully planned.

When roads are under construction, traffic still needs to flow – safely, compliantly and efficiently. That is exactly what we plan for: from traffic management concepts and traffic sign plans to tendering, inspection, MVAS training and innovative traffic systems.

For road and traffic authorities, planning offices and contractors.

Innovative Traffic Systems

Vendor-neutral consulting on innovative traffic systems – and support with implementation, from system selection and project-specific tendering through to trials and acceptance. All systems in detail: 06 · Innovative Traffic Systems →

Transportable Cantilever Masts

Optimum visibility of signage, traffic signals and LED variable message signs – including for tall vehicles, at night and in adverse weather.

Discuss your project

Transportable Sign Gantries

Span the entire carriageway and enable lane-specific signage – ideal at multi-lane exits and weaving sections.

Discuss your project

Automated Alternating Traffic Management

Effective on sections with directional peak flows: the centre lane operates in alternating directions – more capacity where it is needed. Our route analysis shows whether a section qualifies.

Open the route analysis

Weigh-in-Motion (WIM)

Capture axle loads and gross weights in flowing traffic – no stopping required. As a data basis for heavy-traffic analyses, to protect bridges and infrastructure, or for pre-selection for enforcement. We advise on system selection, siting and tendering.

Discuss your project
Speciality from 02 · Traffic Sign Plans & Regulatory Orders

Alternating Traffic Management – Planned on Data

On commuter routes, the dominant direction reverses between morning and evening peak. An alternating traffic management system assigns the centre lane to the loaded direction – more capacity without more road space. Our analysis tool evaluates more than 900 counting stations across Germany and identifies suitable sections. Our services range from data-driven route analysis and traffic management concepts to technical design and tendering.

Open the route analysis

Research & Innovation

New technologies, digital methods and changing requirements are shaping the future of construction. Together with research institutions, authorities and industry partners we work on questions of sustainable construction practice and safe, efficient traffic management – most recently in the VoltaVia research project on the electrification of large construction sites, whose final report was published in 2026.

VoltaVia

Final report published · pilot project wanted

Electrification of Large Road Construction Sites

Far-reaching electrification of large road construction sites is technically feasible today: electrified models exist for 86 % of the machine classes examined. The hurdles lie in providing energy and power on site, integrating charging into the construction sequence and the still low demand. The D-A-CH research project VoltaVia delivers machinery and supply concepts for this as well as a technology-neutral procurement mechanism: the electrification index translates the degree of electrification of a machinery concept into an evaluation advantage – conventional solutions remain permissible. HX mobility coordinated the project.

Pilot project wanted: For the first application of the procurement mechanism in a real tender we are looking for a road construction or rehabilitation project – accompanied by the project team.

Project partners: Zeppelin Rental (project lead) · PEM at RWTH Aachen University · HX mobility (coordination) · funded by BMV, BMIMI and ASTRA within the D-A-CH cooperation, programme management FFG

Discuss a projectResults & final report on volta-via.de →

Pilot Projects & Field Trials

Testing new methods and technologies under real site conditions and transferring them into planning practice – most recently the VoltaVia procurement mechanism, for which we are seeking a pilot project.

3D Models & As-Built Plans

Digital as-built plans and 3D models for coordination and visualisation – with structured data handover to all parties.

BIM

BIM-based modelling and visualisation of traffic and work-zone scenarios, integrated into existing project workflows.

Explore Innovation & Research
Service area 07 · UAV Surveys & Geodata

Aerial data that flows straight into plans and quantity statements

Photogrammetric surveys of road and rail construction sites – RTK-supported with SAPOS, georeferenced in the official reference frame. What sets us apart from a pure survey provider: we process orthophoto, point cloud and terrain model ourselves – into the traffic sign plan, the phasing concept, the quantity survey.

  • True orthophoto & DSM/DTMPositionally accurate planning basis at 1–2 cm ground sampling distance
  • Progress & quantitiesTime series, difference models, verifiable volume reports
  • Road & railGeographical zones under § 21h LuftVO – coordination included
Go to UAV Surveys →
Genuine orthophoto · own RTK survey flight
Professionally networked Member of the Industrieverband Straßenausstattung e. V. (IVSt) and the BIM Cluster Baden-Württemberg

Let's Talk About Your Project

Your Contact

Axel Hätinger
Axel Hätinger
Managing Director
HX mobility GmbH

Axel Hätinger advises clients, planning offices and contractors on the design, planning and implementation of temporary traffic management. His focus areas: complex motorway work zones, alternating traffic management, tendering and the introduction of innovative technologies into work zone safety.

Get in Touch

info@hxmobility.com
LinkedIn: HX mobility GmbH

Discuss your project

A short project description or planning documents are all we need for an initial assessment.